Nuclear Power Plant news pg. 2437

JE Temelin traffic

Information on NPP Temelín 91 / 2007

Unit 1 is in operation at planned power level. At Unit 2, a planned outage is under way, that is connected with the annual refueling of ¼ of the reactor fuel. All auxiliary systems are working in accordance with the operation needs of individual units.

9. 5. 2007

JE Temelin traffic

Information from the NPP Temelín 90 / 2007

Unit 1 is in operation on the planned power level. Unit 2 was switched off the power distribution grid on Friday May 4 at 21 o’clock and the planned two months outage has been started. All auxiliary systems of the power plant are in operation in accordance with the operational needs of the units.

9. 5. 2007

JE Dukovany traffic

Information on Dukovany NPP, May 7th 2007

Units 1,2,3,4 are operated at full rated power. All auxiliary systems are working in accordance with operational needs of units. Electricity production since the beginning of operation: 270 461 957 MWh.

7. 5. 2007

Others

Electricity production from biomass in CEZ Group has increased by 37.8 % to almost 68 GWh compared to the previous year

CEZ Group significantly increased electricity production from co-burning of biomass in the first quarter of this year. Total production reached 67,561 MWh and represented a year-on-year increase of 37.8 %. Total weight of the used biomass exceeded 74 thousand tonnes (a year-on-year increase of 41.6 %).

4. 5. 2007