Nuclear Power Plant news pg. 2485
Information on NPP Temelín 232/2006
Both Unit 1 and 2 are in operation at full rated power.
28. 11. 2006
Information on NPP Temelín 231/2006
Both Unit 1 and 2 are in operation at full rated power.
Both Unit 1 and 2 are in operation at full rated power.
Both Unit 1 and 2 are in operation at full rated power.