Nuclear Power Plant news pg. 2516

JE Temelin traffic

Information from the NPP Temelín 151 / 2006

Unit 2 is in operation at planned power level. A larger than usual amount of dirt condensate was found in two hermetically closed and unserviced rooms yesterday afternoon.The condensate subsequently flew off through the drainage collecting system that is assigned to this task into the collecting tank to be purified.

3. 8. 2006

JE Temelin traffic

Information on NPP Temelín 150 / 2006

Unit 2 is in operation at planned power level. At Unit 1, a planned outage is under way, that is connected with the annual refueling of ¼ of the reactor fuel. All auxiliary systems are working in accordance with the operation needs of individual units.

3. 8. 2006

JE Dukovany traffic

Information on Dukovany NPP, August 3rd 2006

Units 1,2,3,4 are operated at full rated power. All auxiliary systems are working in accordance with operational needs of units. Electricity production since the beginning of operation: 260 214 304 MWh.

3. 8. 2006

JE Dukovany traffic

Information on Dukovany NPP, August 2nd 2006

Units 1,2,3,4 are operated at full rated power. All auxiliary systems are working in accordance with operational needs of units. Electricity production since the beginning of operation: 260 171 733 MWh.

2. 8. 2006