Nuclear Power Plant news pg. 3
INFORMATION ON NPP TEMELÍN 59 / 2025
Both Unit 1 and 2 is in the operation. The auxiliary systems are working in accordance with the operation needs of individual units.
25. 3. 2025
Information on NPP DUKOVANY 25/3/2025
Units 1, 2 are in the operation. The Unit 3 is in the outage. The Unit 4 is in the startup mode. Electricity production since the beginning of the operation: 523 845 336 MWh.