5. 5. 2005
Dukovany Nuclear Power Plant at a new output of 454MW
Twenty years after taking the 1st unit of the nuclear power plant from 144 hour confirmative operation with a 100 % output to trial operation, this is the first time the operation of the 3rd unit has enhanced its effectiveness and output.