Nuclear Power Plant news pg. 1092
Informace z JE Temelín 223 / 2007
Both Unit 1 and 2 are in operation at full rated power. The auxiliary systems of the power plant are in operation in accordance with the operational needs of the units.
14. 11. 2007
Information on NPP Temelín 222 / 2007
Both Unit 1 and 2 are in operation at full rated power. The auxiliary systems of the power plant are in operation in accordance with the operational needs of the units.