Nuclear Power Plant news pg. 1095
Information on NPP Temelín 210 / 2007
Both Unit 1 and 2 are in operation at full rated power. The auxiliary systems of the power plant are in operation in accordance with the operational needs of the units.
26. 10. 2007
Information on NPP Temelín 209 / 2007
Both Unit 1 and 2 are in operation at full rated power. The auxiliary systems of the power plant are in operation in accordance with the operational needs of the units.