Nuclear Power Plant news pg. 1116

JE Temelin traffic

Information on NPP Temelín 120 / 2007

Unit 1 is in operation at planned power level. At Unit 2, a planned outage is under way, that is connected with the annual refueling of ¼ of the reactor fuel. All auxiliary systems are working in accordance with the operation needs of individual units.

19. 6. 2007

JE Temelin traffic

Information on NPP Temelín 119 / 2007

Unit 1 is in operation at planned power level. At Unit 2, a planned outage is under way, that is connected with the annual refueling of ¼ of the reactor fuel. All auxiliary systems are working in accordance with the operation needs of individual units.

18. 6. 2007

JE Temelin traffic

Information on NPP Temelín 118 / 2007

The first Unit is operated at a planned power level. At Unit 2, the planned outage connected with the replacement of ¼ of fuel in the reactor is under way. All auxiliary systems of the power plant are working in accordance with the operation needs.

15. 6. 2007

JE Temelin traffic

Information on NPP Temelín 117 / 2007

Unit 1 is in operation at planned power level. At Unit 2, a planned outage is under way, that is connected with the annual refueling of ¼ of the reactor fuel. All auxiliary systems are working in accordance with the operation needs of individual units.

14. 6. 2007