Nuclear Power Plant news pg. 1119

JE Temelin traffic

Information on NPP Temelín 107 / 2007

Unit 1 is in operation at planned power level. At Unit 2, a planned outage is under way, that is connected with the annual refueling of ¼ of the reactor fuel. All auxiliary systems are working in accordance with the operation needs of individual units.

31. 5. 2007

JE Temelin traffic

Information on NPP Temelín 106 / 2007

Unit 1 is in operation at planned power level. At Unit 2, a planned outage is under way, that is connected with the annual refueling of ¼ of the reactor fuel. All auxiliary systems are working in accordance with the operation needs of individual units.

30. 5. 2007

JE Temelin traffic

Information on NPP Temelín 105 / 2007

Unit 1 is in operation at planned power level. At Unit 2, a planned outage is under way, that is connected with the annual refueling of ¼ of the reactor fuel. All auxiliary systems are working in accordance with the operation needs of individual units.

29. 5. 2007

JE Temelin traffic

Information on NPP Temelín 104 / 2007

Unit 1 is in operation at planned power level. At Unit 2, a planned outage is under way, that is connected with the annual refueling of ¼ of the reactor fuel. All auxiliary systems are working in accordance with the operation needs of individual units.

28. 5. 2007