Nuclear Power Plant news pg. 1153
Information on NPP Temelín 213/2006
Unit 1 is in operation at planned power level. At Unit 2, the planned regular outage connected with the annual refueling of 1/4 of the reactor fuel continues.
31. 10. 2006
Information on NPP Temelín 212/2006
Unit 1 is in operation on planned power level. At Unit 2, the planned outage is continued that is connected with the yearly replacement of ¼ of the reactor fuel.