Nuclear Power Plant news pg. 1199
Information on NPP Temelín 18 / 2006
Unit 1 is in operation at planned power level. Unit 2 is shut down as planned to perform the replacement of the high pressure turbine rotor.
25. 1. 2006
Information on NPP Temelín 17/2006
The first Units is operated at a planned power level. Unit 2 is shutdown as planned for the replacement of the high pressure turbine rotor.