Nuclear Power Plant news pg. 1200
Information on NPP Temelín 14/2006
The first Units is operated at a planned power level. Unit 2 is shutdown as planned for the replacement of the high pressure turbine rotor.
19. 1. 2006
Information on NPP Temelín 13/2006
The first Units is operated at a planned power level. Unit 2 is shutdown as planned for the replacement of the high pressure turbine rotor.