Nuclear Power Plant news pg. 2610

JE Temelin traffic

Information on NPP Temelín 36/2006

Unit 1 and Unit 2 are in operation at planned power level. All auxiliary systems are working in accordance with the operation modes of individual units.

20. 2. 2006

JE Dukovany traffic

Information on Dukovany NPP, February 20th 2006

Units 1,2,4 are operated at full rated power. Unit 3 is before the refueling outage so that it is operated with a lower power at a temperature and power effect. All auxiliary systems are working in accordance with operational needs of units. Electricity production since the beginning of operation: 253 946 261 MWh.

20. 2. 2006

JE Temelin traffic

Information on NPP Temelín 35/2006

Unit 1 and Unit 2 are in operation at planned power level. All auxiliary systems are working in accordance with the operation modes of individual units.

17. 2. 2006

JE Dukovany traffic

Information on Dukovany NPP, February 17th 2006

Units 1,2,4 are operated at full rated power. Unit 3 is before the refueling outage so that it is operated with a lower power at a temperature power effect. All auxiliary systems are working in accordance with operational needs of units. Electricity production since the beginning of operation: 253 816 296 MWh.

17. 2. 2006