Nuclear Power Plant news pg. 2643
Information on NPP Temelín 251/2005
Unit 1 is shut down to repair the electric magnet in one of the pumps. Unit 2 is in operation at a planned output.
30. 12. 2005
Information on NPP Temelín 250/2005
Unit 1 is shut down to repair the electric magnet in one of the pumps. Unit 2 is in operation at a planned output.