JE Temelin traffic

INFORMATION ON NPP TEMELÍN 210 / 2008

Unit 1 is in the outage. At present the works on the preparation of turbine generator´s repair is under way. Today the low pressure turbine rotor will be transported to Škoda Power Company in Plzeň. The inspections and repair will be carried out there. Yesterday at 24 o´clock the Unit 2 was switched from the distribution grid. Its short outage has started. During the outage the oil intake to the control valves will be repaired. According the schedule the unit will be switched on grid this evening.

24. 10. 2008

JE Temelin traffic

Information on NPP Temelín 209 / 2008

At Unit 1, the outage is under way, that is connected with the revision of the third low pressure turbine generator. Today at midnight, Unit 2 will be switched from the distribution grid and the reactor power reduced to 15 %. The reason is the need for a repair on the oil intake to the control valves that control the steam flow to the high pressure turbine. The repair is planned to last for 16 hours. Till the outage, the unit will operate at a power reduced by a quarter.

23. 10. 2008

JE Temelin traffic

Information on NPP Temelín 208 / 2008

Unit 2 is in operation at planned power level. At Unit 1, the outage is under way, that is connected with the revision of the third low pressure turbine generator. The auxiliary systems are working in accordance with the operation needs of individual units.

22. 10. 2008

JE Temelin traffic

Information on NPP Temelín 207 / 2008

Unit 2 is in operation at planned power level. At Unit 1, the outage is under way, that is connected with the revision of the third low pressure turbine generator. The auxiliary systems are working in accordance with the operation needs of individual units.