Information on NPP Temelín 124 / 2008
Unit 1 is in operation at planned power level. At Unit 2, a planned outage is under way, that is connected with the annual refueling of 1/4 of the reactor fuel. The auxiliary systems are working in accordance with the operation needs of individual units.
26. 6. 2008
Information on NPP Temelin 123 / 2008
Unit 1 is in operation at planned power level. At Unit 2, a planned outage is under way, that is connected with the annual refueling of 1/4 of the reactor fuel. The auxiliary systems are working in accordance with the operation needs of individual units.
25. 6. 2008
Information on NPP Temelín 122 / 2008
Unit 1 is in operation at planned power level. At Unit 2, a planned outage is under way, that is connected with the annual refueling of 1/4 of the reactor fuel. The auxiliary systems are working in accordance with the operation needs of individual units.
24. 6. 2008
Information on NPP Temelín 121 / 2008
Unit 1 is in operation at planned power level. At Unit 2, a planned outage is under way, that is connected with the annual refueling of 1/4 of the reactor fuel. The auxiliary systems are working in accordance with the operation needs of individual units.